A planned two-month closure of the A14 outside Ipswich has been hit with further delays.
The stretch of road between junction 52 for Claydon and junction 55 for Copdock Interchange was originally meant to close on Tuesday for essential repairs to "extend the life of the road surface".
At first the roadworks were postponed until Monday, September 9 but National Highways has confirmed further delays have pushed the start date back to Monday, September 16 - nearly a month after the roadworks were originally scheduled to start.
A spokesman said the further postponement will allow operatives "to incorporate maintenance planned for later in the year and reduce the number of closures required on this section of the A14".
READ MORE: All you need to know ahead of two month A14 closure
Work will be carried out on weeknights between 8pm and 6pm but will be weather permitting.
The works are expected to last two months.
While the stretch of A14 is closed, drivers will be diverted along the B1113 through Sproughton.
Traffic management will be in place throughout the area in order to mitigate speeding and reduce disruption to local residents.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here